The District Engineer shall be given 24 hours notice prior to the survey and after completion of the survey.
37 Miss. Code. R. § 1-7501-03004-302
The District Engineer shall be given 24 hours notice prior to the survey and after completion of the survey.
37 Miss. Code. R. § 1-7501-03004-302