Contractor shall submit a negative or no change OCR-484 to the Project Engineer if no payments are made this period.
37 Miss. Code. R. § 1-6203-01000-103
Contractor shall submit a negative or no change OCR-484 to the Project Engineer if no payments are made this period.
37 Miss. Code. R. § 1-6203-01000-103