The DBE Subcontractor and the Prime Contractor shall receive copies of the form OCR-483. This form is completed when a DBE subcontractor has completed at least 50% of its work or at any time a problem arises, the project engineer or his designated representative will complete the OCR-483 form.
37 Miss. Code. R. § 1-6203-00900-103