33 Miss. Code. R. 204-15.1

Current through December 10, 2024
Rule 33-204-15.1 - Preparation and Approval

The preparation and approval of the contact drawings and specifications will follow the procedures as included in the Residential Development Standards and Guidelines and Commercial Development Standards and Guidelines of the District, as amended or supplemented.

33 Miss. Code. R. 204-15.1

Miss. Code Ann. § 51-9-127 (Rev. 2000)