Rule 33-204-14.1 - Implementation

After the traffic impact analysis report has been reviewed and approved by the General Manager or his designee, the Developer can then proceed with the construction drawings and specifications for required roadway and traffic control modifications/enhancements.

33 Miss. Code. R. 204-14.1

Miss. Code Ann. § 51-9-127 (Rev. 2000)