33 Miss. Code. R. 2-3.10.3

Current through December 10, 2024
Rule 33-2-3.10.3

The loan repayment period will commence as soon as practical after transmittal of the final loan agreement to the loan recipient and end as established in the Intended Use Plan IUP under which the project is funded. A reduced period may be provided, if so requested by the loan recipient.

33 Miss. Code. R. 2-3.10.3

Miss. Code Ann. § 41-3-16(3)(b)
Amended 7/31/2016
Amended 5/25/2017