The Port's Contract Monitor will brief all contractors on access control and documentation procedures implemented by this instruction. Contractors using prepaid material or dealing with material owned by or to be returned to the Port will further be briefed on dock receipt procedures by the Port's Contract Monitor.
28 Miss. Code. R. 301-28.6