This operating procedure establishes the guideline procedures for the selection and engagement of outside professional project management, architectural, engineering, design, and construction management services for public works project at the Port of Gulfport that shall cost in excess of $50,000. For purposes of this operating procedure, "public works projects" shall include both new construction and major maintenance projects. The term "public works costs" shall mean the cost of engineering plus the cost of the improvements (construction and maintenance).
28 Miss. Code. R. 301-15.1