When a protest has been filed within seven (7) days and before an award has been made, the Port Authority shall make no award of the contract until the protest has been settled unless the Executive Director makes a written determination, after consulting with the Board of Commissioners, that the award of the contract without delay is necessary to protect substantial interests of the Port Authority.
28 Miss. Code. R. 301-13.11