As a condition of granting a permit, the Commission may require mitigation as a means of minimizing net adverse impacts on coastal wetlands. The magnitude of any mitigation requirement must be reasonably related to the magnitude of the activity under consideration.
22 Miss. Code. R. 23-06-106