Within three (3) business days following completion of all work to correct the installation deficiencies, the installer/transporter must contact the Fire Marshal's Office to arrange for the re-inspection of the home installation site. Such inspection shall be performed as soon as practicable by an inspector.
19 Miss. Code. R. 7-5.02.4.4