Section 19-7-5.02.4.1 - Certificate of Inspection

When the installation work is complete, the retailer and/or installer/transporter shall certify by signature at the bottom of the Property Locator/Certificate of Installation, devised for reprint purposes, that:

A. The Factory-Built home has been installed in accordance with:
1. An installation design and instructions that have been provided by the manufacturer and approved by the Secretary for Housing and Urban Development directly or through review by the DAPIA; or,
2. An installation design and instructions that have been prepared and certified by a professional engineer or registered architect, that have been approved by the manufacturer and the DAPIA as providing a level of protection for residents of the home that equals or exceeds the protection provided by MH-5, as amended.
3. If the installation instructions do not comply with the installation standards, the manufacturer is responsible for any aspect of installation that is completed in accordance with the installation instructions and that does not comply with the installation standards.
4. If a Factory-Built home is classified as "used" and the manufacturer instructions cannot be located, the installer/transporter shall comply with the provisions of this regulation, as amended, in installing the Factory-Built home.
5. Upon completion of the inspection, where the inspector has verified the installation as proper and has passed the home, a signed Certificate of Inspection will be sent to the homeowner and to the installer/transporter and to the retailer when applicable. This certificate is verification that the installation of the home has passed a final inspection.

19 Miss. Code. R. 7-5.02.4.1

Miss. Code Ann. §§ 97-7-10; 75-49-7(2); 75-49-19; 75-49-11; 75-49-1 et seq. (Supp. 2013).