19 Miss. Code. R. 7-5.02.3-1

Current through December 10, 2024
Section 19-7-5.02.3-1 - Scheduling of the Inspection
A. For all new or used residential Factory-Built homes involving a retailer, the retailer is required within three (3) business days of the completion of the installation, minus skirting, to submit by email, facsimile, or priority mail, a properly completed and signed Property Locator/Certificate of Installation to the Factory-Built Home Division of the State Fire Marshal's Office. This will provide information on the exact location where the home has been installed.
B. For secondary sitings not involving a retailer, the installer/transporter is required to submit within three (3) business days of the completion of the installation, minus skirting, by e-mail, facsimile, or priority mail, the properly completed and signed Property Locator/Certificate of Installation to the Factory-Built Home Division of the State Fire Marshal's Office, for all Factory-Built homes. This will provide information on the exact location of the home and when the home has been installed.

19 Miss. Code. R. 7-5.02.3-1

Miss. Code Ann. §§ 75-49-5; 75-49-9; 75-49-11 (Supp. 2015).
Adopted 1/1/2015
Amended 10/1/2016