Current through December 10, 2024
Section 19-7-3.03.5.12 - Frequency of InspectionsA. After the initial plant certification, the approved construction inspection agency shall inspect as follows: 1. Each modular home or component in at least one stage of construction;2. Every stage of construction during the course of each inspection visit to a manufacturing facility.3. Conduct unannounced inspections at the manufacturing site to review any aspects of the manufacturing process.B. However, nothing in this section shall preclude an approved construction agency from conducting inspections at a greater frequency than the minimum prescribed herein if, in the agency's professional judgment, such action is necessary to discharge its responsibilities properly. In determining the appropriate frequency of inspection for any manufacturer, an approved construction inspection agency should consider such factors as: 1. The production volume of the factory;2. The complexity of the design;3. The qualifications of the manufacturer's quality control personnel; and4. The experience record of the manufacturer.19 Miss. Code. R. 7-3.03.5.12
Miss. Code Ann. § 75-49-5 (Supp. 2013).