Current through December 10, 2024
Section 12-6-3.113.02.1 - StandardsFactors to be considered in determining whether the standard of responsibility has been met include whether a prospective contractor has:
(1) Available the appropriate financial, material, equipment, facility, and personnel resources and expertise, or the ability to obtain them, necessary to indicate its capability to meet all contractual requirements;(2) A satisfactory record of performance;(3) A satisfactory record of integrity;(4) Qualified legally to contract with the State; and(5) Supplied all necessary information in connection with the inquiry concerning responsibility.12 Miss. Code. R. 6-3.113.02.1