Mistakes may be corrected or bids may be withdrawn during Phase One at any time. During Phase Two, mistakes may be corrected or withdrawal permitted in accordance with Subsection 3.106.12, Mistakes in Bids.
12 Miss. Code. R. 6-3.106.20
Mistakes may be corrected or bids may be withdrawn during Phase One at any time. During Phase Two, mistakes may be corrected or withdrawal permitted in accordance with Subsection 3.106.12, Mistakes in Bids.
12 Miss. Code. R. 6-3.106.20