Following notification by the Bureau that a Contract has been awarded, the Professional will:
Division 1: General Requirements
Division 2: Existing Conditions
Division 3: Concrete
Division 4: Masonry
Division 5: Metals
Division 6: Wood, Plastics and Composites
Division 7: Thermal and Moisture Protection
Division 8: Openings
Division 9: Finishes
Division 10: Specialties
Division 11: Equipment
Division 12: Furnishings
Division 13: Special Construction
Division 14: Conveying Equipment
Division 21: Fire Suppression
Division 22: Plumbing
Division 23: HVAC
Division 25: Integrated Automation
Division 26: Electrical
Division 27: Communications
Division 28: Electronic Safety and Security
Division 31: Earthwork
Division 32: Exterior Improvements
Division 33: Utilities
Division 34: Transportation
Division 35: Waterway and Marine Construction
Division 40: Process Interconnections
Division 41: Material Processing and Handling Equipment
Division 42: Process Heating, Cooling, and Drying Equipment
Division 43: Process Gas and Liquid Handling, Purification, and Storage Equipment
Division 44: Pollution and Waste Control Equipment
Division 45: Industry-Specific Manufacturing Equipment
Division 46: Water and Wastewater Equipment
Division 48: Electrical Power Generation
The following checklist will aid in the Contract preparation: (more detail distributed at bid opening)
Once the OFFICIAL CONTRACT DOCUMENTS have been prepared, the Professional will obtain the Contractor's (original) signature on both of the Documents and forward them to the Bureau for the Bureau Director's and Attorney General's representative's signatures. Copies will be distributed as indicated in Item 1 above.
The Professional shall, unless waived by the Owner, also submit one electronic format copy of the updated Contract Documents (plans and specifications) in coordination with said Contract Documents mentioned above. Said electronic submittal to be submitted within thirty (30) days after award by the Owner in .pdf format uploaded to Bricks. The Professional shall also provide electronic format copy to Contractor for preparation of As-Built Construction Documents. (Modified Dec 2013 SoS)
12 Miss. Code. R. 3-20-600.57