12 Miss. Code. R. 3-20-600.23

Current through December 10, 2024
Section 12-3-20-600.23 - THE CONSTRUCTION DOCUMENTS

Once the Bureau has approved the Design Development Phase, the Professional will prepare working Drawings and a Project Manual detailing specifications regarding the Work.

The Work

* Materials

* Workmanship

* Finishes

* Mechanical and electrical systems

* Asbestos abatement

* Special equipment

* Site work

* Utility connections and services

* Bidding information

* Proposals

* Contract and bond forms

* General, special and supplementary conditions of the Contract

* Other information required for receiving bids on the Project

12 Miss. Code. R. 3-20-600.23

Adopted 11/25/2016
Amended 3/15/2021