Projects having total funds less than $1,000,000 may not require liquidated damages; however, the Professional should consult with Bureau Staff prior to preparing the Construction Documents. All Projects more than $1,000,000 will require liquidated damages and the amount to be stipulated.
12 Miss. Code. R. 3-2.1-600.34