12 Miss. Code. R. 3-2.1-1-01900-1-1.01

Current through December 10, 2024
Section 12-3-2.1-1-01900-1-1.01 - WORK SEQUENCE
A. Owner will occupy the building during construction, coordinate with Owner's Representative in scheduling work to vacate the areas as the Contractor requires.
B. Construct work in stages as follows:
1. __________________________________________________
2. __________________________________________________
3. _____________________________________________

12 Miss. Code. R. 3-2.1-1-01900-1-1.01