Section 12-3-2.1-1-01041-1.02 - DUTIES OF PROJECT COORDINATOR
A. General:
1. Coordination: Coordinate the work of all Subcontractors and Material Suppliers.
2. Supervision: Supervise the activities of every phase of work taking place on the Project.
3. Mechanical/Electrical: Take special care to coordinate and supervise the work of the plumbing, heating and cooling and electrical Subcontractors.
4. Communication: Establish lines of authority and communication at the job site.
5. Location: The Project Coordinator must be present on the job all of the time.
6. Permits: Assist in obtaining building and special permits required for construction.
B. Interpretations of Contract Documents:
1. Consultation: Consult with Architects and Engineers to obtain interpretations.
2. Assistance: Assist in resolution of any questions.
3. Transmission: Transmit written interpretations to concerned parties.
C. Cessation of Work: Stop all work not in accordance with the requirements of the Contract Documents.
D. Division One: Coordinate and assist in the preparation of all requirements of Division One and specifically as follows:
1. Cutting and Patching: Supervise and control all cutting and patching of other trades' work.
2. Project Meetings: Schedule and preside at all project meetings.
3. Construction Schedules: Prepare and submit all construction schedules; supervise work to monitor compliance with schedules.
4. Shop Drawings, Product Data and Samples: Administer the processing of all submittals required by the Project Manual.
5. Schedule of Values: Assist in preparation and be knowledgeable of each entry in the Schedule of Values.
6. Testing: Coordinate all required testing.
7. Temporary Facilities and Controls: Allocate, maintain and monitor all temporary facilities.
8. Substitutions and Product Options: Administer the processing of all substitutions.
9. Project Closeout: Conduct final inspections and assist in collection and preparation of closeout documents.
10. Cleaning: Direct and execute a continuing cleaning program throughout construction, requiring each trade to dispose their own debris.
11. Project Record Documents: Maintain up-to-date project record documents.
12. Safety Measures: Plan and enforce all safety requirements.
E. Changes: Recommend and assist in the preparation of requests to the Professional for any changes in the Contract.
F. Application for Payment: Assist in the preparation and be knowledgeable of each entry in the Application and Certificate for Payment.