Current through December 10, 2024
Section 12-3-2.1-1-01020-1.01 - DESCRIPTIONA. Related Work Specified Elsewhere: Sections of Specifications as listed under Schedule of Allowances.B. Allowances for Products: 1. Purchase products under each allowance as directed by the Professional.2. Amount of each allowance includes: b. Delivery and unloading at site.3. In addition to amounts of allowances, include in bid, for inclusion in Contract sum, Contractor's costs for:a. Handling at site, including uncrating and storage. b. Protection from elements and damage.c. Labor, installation and finishing.d. Other expenses required to complete installation.C. Selection of Products: 1. Architect's Duties: Consult with Contractor in consideration of products and Suppliers; make selections, designate products to be used; and, notify Contractor in writing.2. Contractor's Duties: Assist Professional in determining qualified Suppliers; obtain proposals from Suppliers when requested by the Professional; and, make appropriate recommendations for consideration of the Professional. Upon notification of selection, enter into Purchase Agreement with designated Supplier.D. Delivery: The Contractor is responsible for arranging all delivery and unloading and should promptly inspect products for damage or defects and submit claims for transportation damage.E. Installation: Comply with requirements of referenced specification section.F. Adjustment of Costs: Should actual purchase cost be more, or less, than the specified allowance amount, the Contract Sum will be adjusted by Change Order equal to the amount of the difference.12 Miss. Code. R. 3-2.1-1-01020-1.01