11 Miss. Code. R. 8-8-2-A-2-VI

Current through December 10, 2024
Section 11-8-8-2-A-2-VI - Mitigation Plan

Productivity must meet or exceed these standards at least two sampling years by the fifth year. If productivity is not achieved by these dates, the permittee must submit a mitigation plan to the Permit Board which includes the following:

A. a statement outlining the problem;
B. a discussion of what practices, beyond normal farming practices, the operator intends to use to enable the area to finally meet the release standards; and
C. a new Phase III liability release plan.

If renovation, soil substitution, or any other practice which constitutes augmentation is employed, the five-year responsibility period shall restart when the mitigation plan is approved and the practices are completed.

11 Miss. Code. R. 8-8-2-A-2-VI