The Permit Board may modify any surface mining permit to increase or decrease the permit area and shall require an increase in the performance bond and a modified reclamation plan for any expanded area.
11 Miss. Code. R. 8-1.2.8
The Permit Board may modify any surface mining permit to increase or decrease the permit area and shall require an increase in the performance bond and a modified reclamation plan for any expanded area.
11 Miss. Code. R. 8-1.2.8