In the procurement of all construction, equipment, material, supplies, professional services and non-professional services and all other costs related to the SRF project, all loan recipients shall comply with all applicable sections of the Mississippi Code of 1972, Annotated.
If funds will be received from other agencies, the loan recipient shall review that agency's procurement requirements and follow whichever is more stringent.
The procurement and conduct of all professional engineering and land surveying services shall be in accordance with the Code of Conduct and other guidance and interpretations established by the Mississippi State Board of Registration for Professional Engineers and Land Surveyors.
The procurement of all construction contracts shall be in accordance with the rules and regulations of the State Board of Contractors and other guidance and interpretations established by the Mississippi State Board of Contractors.
All loan recipients shall submit a procurement certification, as required by the Department staff, indicating that all of the above referenced requirements have been met. Should it be determined that any of the procurement requirements are violated, the Department may determine that the related costs are unallowable and may require repayment of all SRF Loan funds paid for such costs, in accordance with Rule 4.3.G.(6). of the SRF regulations.
Miss. Code. tit. 11, pt. 6, ch. 4, app 11-6-4-D