The requirements in subparts 2 to 4 for application at agronomic rates, pathogen and vector attraction reduction, monitoring, record keeping, and reporting, unless specified otherwise in a permit, shall be met by persons who prepare the sewage sludge from septic tanks which is referred to in this part as septage.
The agronomic application rate for septage applied to agricultural land, forest, or a reclamation site for a cropping year must be calculated using the equation in this subpart unless specified otherwise by the commissioner. The commissioner may specify the rate based on an actual nitrogen analysis.
AR = | N _____ 0.0026 |
Where,
AR = Application rate in gallons per acre for the cropping year.
N = The maximum available nitrogen application rate in pounds per acre per cropping year required by the crop based on realistic yield goals or nitrogen uptake by vegetation grown on the land minus the amount supplied by other sources such as manure or fertilizer.
To meet pathogen and vector attraction reduction requirements, the site restrictions in part 7041.1300, subpart 3, item D, must be met and either:
The permittee must obtain and keep on record for five years, the information required to be in compliance with this chapter including:
"I certify, under penalty of law, that the information that will be used to determine compliance with the pathogen and vector attraction reduction requirements in subpart 3, item A, B, or C [insert either subpart 3, item A, B, or C] the management practices in part 7041.1200, and the site restrictions in part 7041.1300, subpart 3, item D, has been prepared under my direction and supervision according to the system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen and vector attraction reduction requirements have been met. I am aware that there are significant penalties for false certification including the possibility of fine and imprisonment.";
The information in items A to J must be recorded by the permittee on a form provided or approved by the commissioner and submitted annually to the agency no later than December 31 following the end of the cropping year.
Minn. R. agency 167, ch. 7041, pt. 7041.1800
Statutory Authority: MS s 116.07