Air overpressure standards:
Ground vibration control:
where: W= the charge weight per delay (eight milliseconds or more), and d= the distance (in feet) from the blast to the nearest structure located on lands not owned or controlled by the permittee to determine the weight of allowable explosive per decay.
When the monitoring is chosen, or complaints are received, seismic measurements shall be conducted adjacent to the nearest structure located on lands not owned or controlled by the permittee and where the commissioner deems necessary to investigate complaints.
All monitoring data collected shall be saved for a period of six years and made available to the commissioner upon request.
Minn. R. agency 158, ch. 6130, TACONITE AND IRON ORE RECLAMATION STANDARDS, pt. 6130.3900
Statutory Authority: MS s 93.47