The permittee shall submit to the commissioner in duplicate an operating plan covering a forthcoming period, which does not exceed five years in length. The operating plan shall consist of the plans normally prepared for the mining operation which shall include the following:
Subsequent plans shall be submitted 90 days before the end of the prior plan.
Minn. R. agency 158, ch. 6130, METALLIC MINERALS MINING PERMIT, pt. 6130.4400
Statutory Authority: MS s 93.47