Minn. R. agency 144, ch. 4761, LEAD STANDARDS; METHODS, pt. 4761.2610

Current through Register Vol. 49, No. 24, December 9, 2024
Part 4761.2610 - PROJECT RECORDS
Subpart 1.On-site records.

A certified lead firm, lead supervisor, or property owner performing lead hazard reduction must ensure that the following records are readily available for review by the commissioner or the assessing agency with jurisdiction at the work site during the entire period of the project:

A. a daily sign-in and sign-out log that identifies individuals performing lead hazard reduction by name, license number, if applicable, and the time on and off site; and
B. a copy of the occupant protection plan as developed according to part 4761.2615.
Subp. 2.Record retention.

A certified lead firm, lead supervisor, or property owner must retain the records in subpart 1 for three years after completing the project.

Minn. R. agency 144, ch. 4761, LEAD STANDARDS; METHODS, pt. 4761.2610

29 SR 531

Statutory Authority: MS s 144.9508