The property owner must:
A well or boring not repaired or corrected must be permanently sealed.
Materials used in maintenance, replacement, or repair must meet the requirements of this chapter for new installation.
When all casing is removed from a well or boring, the installation of new casing or the reinstallation of casing is considered new construction and must meet all the requirements of this chapter for new construction, including termination of the casing at least 12 inches above the established ground surface, and compliance with the applicable isolation distance requirements.
A noncomplying well or boring constructed prior to July 15, 1974, may be repaired as long as the repair meets the requirements of this chapter.
A well or environmental bore hole with the upper termination of the casing buried below the established ground surface must have the casing extended 12 inches above the ground surface when the well or boring is uncovered.
Minn. R. agency 144, ch. 4725, WELL AND BORING GENERAL CONSTRUCTION AND USE REQUIREMENTS, pt. 4725.3750
Statutory Authority: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; 144.05; 144.12; 144.383; 157.04; 157.08; 157.09; 157.13