Minn. R. agency 138, ch. 7852, PIPELINE ROUTING PERMIT, pt. 7852.3500

Current through Register Vol. 49, No. 24, December 9, 2024
Part 7852.3500 - RIGHT-OF-WAY PLAN AND PROFILE CONSTRUCTION SPECIFICATIONS REVIEW

Following issuance of a pipeline routing permit, a permittee shall provide the commission with a plan and profile of the right-of-way and the specifications and drawings for right-of-way preparation, construction, and restoration at least 14 days before right-of-way preparation of that segment of the pipeline. The commission may shorten this time limit if it can be shown that earlier construction will not preclude proper review. If the permittee makes any significant change in its plan and profile and the specifications and drawings for right-of-way preparation, construction, and restoration, it shall notify the commission in writing of the changes.

Minn. R. agency 138, ch. 7852, PIPELINE ROUTING PERMIT, pt. 7852.3500

13 SR 2046; L 2005 c 97 art 3 s 19

Statutory Authority: MS s 116I.015; 216G.02