Mich. Admin. Code R. 460.2351

Current through Vol. 24-21, December 1, 2024
Section R. 460.2351 - Meters and associated metering devices; inspections; tests; and records

Rule 51. Inspections and tests of meters and associated metering devices must be made by, or on behalf of, each utility as follows:

(a) A meter or an associated metering device that is not included as a part of the meter, or both, must be inspected and tested before being placed in service, and the error must not be more than 1.0%.
(b) A meter or an associated metering device, or both, must be tested after it is removed from service. These tests must be made before the meter or associated metering device is adjusted, repaired, or retired.
(c) A repaired meter or a meter that is removed from service must be leak-tested before being returned to service, subject to the following requirements:
(i) If tested in the field, a meter must be tested at the actual meter operating pressure of the system.
(ii) If tested in the shop, a meter must be subjected to an internal pressure test of, at a minimum, 3.0 pounds per square inch gauge pressure. In addition, any meter that will operate above 3.0 pounds per square inch gauge pressure must be so marked on the meter and must be subjected to 1 of the following tests:
(A) An internal pressure test of, at a minimum, the manufacturers rated operating pressure.
(B) An internal pressure test at 10% above the maximum operating pressure to which the meter could be subjected.
(C) Any suitable test that is approved by the commission.
(iii) During the pressure test, the meter must be checked for leaks by 1 of the following tests:
(A) Immersion test.
(B) Soap test.
(C) Pressure drop test of a type that is approved by the commission.
(d) As part of its rate book, a utility shall file, for commission approval, a statement of its policy with regard to testing meter accuracy upon a customers request. In the absence of a filed policy approved by the commission, the utility shall adhere to both of the following provisions:
(i) A utility shall test meter accuracy upon the request of a customer if the customer does not request a test more than once every 2 years and if the customer agrees to accept the results of the test as the basis for determining the difference claimed. A charge must not be made to the customer for the first test in any 5-year period, but if subsequent tests during the same period, for the same customer, show the meter to be within the allowable limits of accuracy, the utility may charge the customer an amount for subsequent tests which is uniform and which does not exceed the utility's direct cost thereof, plus a reasonable charge for administrative overhead. The customer may be present at the test if he or she makes a request before the test.
(ii) A written report must be made to the customer by the utility. The report must state the results of the test. A record of the test must be kept by the utility.
(e) A utility shall make periodic tests of meters, associated devices, and instruments to ensure their accuracy. The tests must be conducted according to the following schedule, unless otherwise approved by the commission. A utility may test meters more frequently than provided in the following schedule without commission approval:
(i) Positive displacement diaphragm-type meters that have capacities of less than 500 cubic feet per hour, not to exceed 123 months.
(ii) Positive displacement diaphragm-type meters that have capacities over 500 cubic feet per hour, not to exceed 87 months.
(iii) Rotary meters that have capacities of less than 15,000 cubic feet per hour, which may be tested in place, not to exceed 51 months.
(iv) Rotary meters that have capacities of 15,000 cubic feet per hour or more, which may be tested in place, not to exceed 27 months.
(v) Other meter types, such as turbine, Coriolis, 4-Path or greater ultrasonic, or other metering technology, which may be tested in place when possible, not to exceed 27 months.
(vi) Orifice meters, 2 times per year with intervals not to exceed 7.5 months.
(vii) Gas instruments, such as base volume, base pressure, and base temperature-correcting devices, must be checked for calibration at intervals that correspond to the schedule for their associated meters. The testing interval must not exceed 51 months.
(viii) Test bottles, deadweight testers, certified test meters, not to exceed 123 months.
(ix) Meter testing systems must be calibrated when first installed and after alterations, damages, or repairs that might affect accuracy. To ensure that the accuracy of a meter testing system is maintained on a continuous basis, a daily leakage test must be made and a weekly accuracy test with a comparison meter of known accuracy must be made. If the test results differ by more than plus or minus 0.5% from the comparison meter, the cause of the error must be determined and necessary corrections must be made before the system is reused. The comparison meter must be checked at an interval of 1 year not to exceed 13 months.
(f) Utilities shall maintain records of meters that have been tested during the preceding calendar year and shall make this information available to the commission upon request. The record must contain all of the following information for each meter tested:
(i) Set year.
(ii) Type of case.
(iii) Manufacturer.
(iv) Customer class, either commercial and industrial or residential.
(v) Results of the meter test.
(vi) Whether the meter was retired and if so the reasons for the retirement.

Mich. Admin. Code R. 460.2351

1979 AC; 1993 AACS; 2020 MR 17, Eff. 9/3/2020