Mich. Admin. Code R. 325.1664

Current through Vol. 24-21, December 1, 2024
Section R. 325.1664 - Abandonment of wells; plugging materials

Rule 164. Abandoned well or dry hole plugging materials shall be placed as follows:

(a) Bentonite chips or bentonite pellets shall be poured slowly into the top of the well or dry hole to prevent bridging in the casing or borehole. Fine bentonite particles that accumulate in the shipping container shall not be used. The plugging operation shall continue until the bentonite chips or bentonite pellets appear at the ground surface. Upon completion of the plugging operation, water shall be placed into the casing or borehole to promote expansion of the bentonite above the static water level.
(b) Neat cement, concrete grout, or bentonite grout shall be placed through a tremie pipe from the bottom of the well or dry hole to the ground surface.
(c) Other materials and methods may be used if the materials and methods proposed to be used will plug the abandoned well or dry hole to prevent them from acting as a channel for contamination or the escape of subterranean gases and if prior approval is given by a health officer.

Mich. Admin. Code R. 325.1664

1979 AC; 1994 AACS