Current through Vol. 24-21, December 1, 2024
Section R. 336.1278a - Scope of permit exemptionsRule 278a.
(1) To be eligible for a specific exemption listed in R 336.1280 to R 336.1291, any owner or operator of an exempt process or exempt process equipment must be able to provide information demonstrating the applicability of the exemption. The demonstration may include the following information: (a) A description of the exempt process or process equipment, including the date of installation.(b) The specific exemption being used by the process or process equipment.(c) An analysis demonstrating that R 336.1278 does not apply to the process or process equipment.(2) The demonstration required by this rule shall be provided within 30 days of a written request from the department. Any other records required within a specific exemption shall be provided within timeframes established within that specific exemption.Mich. Admin. Code R. 336.1278a
2003 AACS; 2016 MR 24, Eff. 12/20/2016