Section R. 336.1214a - Consolidation of permits to install within renewable operating permitRule 214a.
(1) The department shall issue a source-wide permit to install concurrent with each issuance and renewal of a renewable operating permit pursuant to R 336.1214 and each reissuance of a renewable operating permit pursuant to R 336.1217(2)(b). The source-wide permit to install shall be contained in the same document as the renewable operating permit. The source-wide permit to install shall specifically identify, consolidate, and incorporate all federally enforceable terms and conditions of existing permits to install into the renewable operating permit in accordance with the provisions of R 336.1212(5) and the permit content requirements of R 336.1213.(2) The source-wide permit to install is updated whenever a new process-specific permit to install is incorporated into the renewable operating permit in accordance with the provisions of R 336.1216.(3) Both of the following provisions apply to the incorporation of terms and conditions of a permit to install into a renewable operating permit:(a) Within the renewable operating permit, each federally enforceable term or condition that originated in a permit to install shall be specifically identified with an applicable requirement citation of R 336.1201(1)(a). This citation is in addition to the R 336.1213(2)(a) underlying applicable requirement citation. Each term or condition of the renewable operating permit with an applicable requirement citation of R 336.1201(1)(a) shall be considered a term or condition of the source-wide permit to install issued pursuant to this rule.(b) A federally enforceable term or condition of a renewable operating permit shall be considered a term or condition of the source-wide permit to install issued pursuant to this rule, if it can be reasonably demonstrated that the federally enforceable term or condition originated in a permit to install issued pursuant to R 336.1201. Each term or condition in a renewable operating permit issued before the effective date of this rule with any of the following underlying applicable requirements, identified pursuant to R 336.1213(2)(a), shall be considered a term or condition of the source-wide permit to install issued pursuant to this rule:(i)R 336.1201, R 336.1201a.(ii) Title 40 C.F.R. §§ 63.40 to 63.44 and §§ 63.50 to 63.56, adopted by reference in R 336.1902.(iii)R 336.1301(1)(c), R 336.1301(4), and R 336.1331(1)(c).(v)R 336.1702, R 336.1705, R 336.1706, R 336.1708, R 336.1709, and R 336.1710.(vii) Title 40 C.F.R. § 52.21, adopted by reference in R 336.1902.(viii)R 336.2801 to R 336.2819 and R 336.2823.(ix)R 336.2901 to R 336.2903, R 336.2907, and R 336.2908.(4) The source-wide permit to install replaces all existing permits to install, in accordance with R 336.1201(6)(b). Although the source-wide permit to install and the renewable operating permit are contained in the same document, the source-wide permit to install maintains its own authority under section 5505 of the act. If the renewable operating permit expires or is voided, the source-wide permit to install remains in effect, unless the criteria of R 336.1201(6)(a) or (c) are met.(5) State-only enforceable terms and conditions from a permit to install that have been incorporated into a renewable operating permit shall be considered terms and conditions of a state-only enforceable permit to install established pursuant to R 336.1201(2)(d). If the renewable operating permit later expires or is voided, the state-only enforceable permit to install does not expire, nor is it voided, unless the criteria of R 336.1201(6)(a) or (c) are met.(6) Nothing in this rule shall relieve the requirement to obtain a permit to install pursuant to R 336.1201(1) for newly constructed, modified, reconstructed, or relocated process or process equipment that emits an air contaminant.Mich. Admin. Code R. 336.1214a
2003 AACS; 2008 AACS; 2016 MR 24, Eff. 12/20/2016