Current through Register Vol. 51, No. 21, October 18, 2024
Section 26.20.13.08 - Subsidence Control: Public NoticeA. The mining schedule shall be distributed by mail to all owners of property and residents within the area above the underground workings and adjacent areas. Each of these persons shall be notified by mail at least 6 months before mining beneath his property or residence.B. The notification shall contain, as a minimum: (1) Identification of specific areas in which mining will take place;(2) Dates of mining activities that could cause subsidence and affect specific structures; and(3) Measures to be taken to prevent or control adverse surface effects.Md. Code Regs. 26.20.13.08
Regulations .08 were previously codified as COMAR 08.13.09.13 a A_J, respectively. Recodification occurred in April, 1993. For a history of these regulations before April, 1993, see "Administrative History of COMAR 08.13.09 before April, 1993" which follows COMAR 26.20.01.