Section 26.13.05.02-2 - Construction Quality Assurance ProgramA. This regulation applies to the owner or operator of a:(1) Surface impoundment that is subject to the requirements of Regulation .11D(4) or (5) of this chapter;(2) Waste pile that is subject to the requirements of Regulation .12D(1) or (2) of this chapter; or(3) Landfill unit that is subject to the requirements of Regulation .14B(3) or (4) of this chapter.B. The owner or operator of a land disposal unit identified in §A of this regulation shall: (1) Incorporate into facility operations a construction quality assurance program that: (a) Ensures that the constructed unit meets or exceeds all design criteria and specifications in the facility permit; and(b) Has been developed and implemented under the direction of a construction quality assurance officer who is a registered professional engineer; and(2) As qualified by §C of this regulation, ensure that the construction quality assurance program meets the requirements of 40 CFR § 264.19(a)(2), (b), and (c).C. In complying with the requirements of 40 CFR § 264.19, the owner or operator shall: (1) Substitute "Secretary" for "Regional Administrator"; and(2) Substitute the corresponding regulation or regulations identified in COMAR 26.13.01.05B(2) for the provisions in other sections of the Code of Federal Regulations that are cited within 40 CFR § 264.19.D. Certification. The owner or operator of a unit identified in §A if this regulation: (1) May not accept waste into the unit until the owner or operator has submitted to the Department by certified mail or hand delivery a certification signed by the construction quality assurance officer that the: (a) Approved construction quality assurance plan has been successfully carried out;(b) Unit meets the requirements of: (i) Regulation .11D(4) or (5) of this chapter;(ii) Regulation .12D(1) or (2) of this chapter; or(iii) Regulation . 14B(3) or (4) of this chapter; and(c) Procedure of COMAR 26.13.07.15C(2) and (3) regarding inspection by the Department has been carried out; and(2) Shall furnish documentation supporting the construction quality assurance officer's certification to the Department upon request.Md. Code Regs. 26.13.05.02-2
Regulation .02-2 adopted effective 49:1 Md. R. 14, eff. 1/13/2022