Current through Register Vol. 51, No. 22, November 1, 2024
Section 26.10.02.03-2 - New Gasoline UST SystemThe owner of a new gasoline UST system in a high-risk groundwater use area shall:
A. Install all piping, including Stage II vapor recovery piping, in accordance with COMAR 26.10.03.02;B. Install and utilize, on the piping, an interstitial release detector system approved by the National Work Group on Leak Detection Evaluations;C. For USTs with a capacity of greater than 2,000 gallons or for multiple tanks in a shared tank excavation:(1) Install four monitoring pipes in accordance with the specifications in COMAR 26.10.03.04B, so that one monitoring pipe is located in each corner of the tank excavation area; and(2) In conjunction with the monitoring pipes, install a piping system that is designed to allow for active ventilation of the tank excavation area;D. Before placing the UST system in service, test the system for leaks using a helium pressure test, or other test approved by the Department, in accordance with procedures prescribed by the Department;E. Implement one of the following:(1) Install a minimum of three groundwater monitoring wells outside the UST excavation area in locations that will determine groundwater flow and detect a release from the UST system in accordance with COMAR 26.04.04 and Department specifications;(2) Install a pressure control system that: (a) Is approved by the Department;(b) Is continuously operated;(c) Continuously monitors tank pressures;(d) Maintains tank pressure at an average negative pressure; and(e) Prevents the release of gasoline vapors to the environment.(3) Install a soil vapor extraction system in conjunction with the monitoring pipes that will allow for continuous active ventilation of the tank excavation area; or(4) Obtain Department approval for an alternative method that will prevent and detect the release of gasoline liquid and vapors from the UST system;F. In addition to requirements for release detection in COMAR 26.10.05:(1) Test all spill catchment basins and containment sumps in accordance with COMAR 26.10.03.03;(2) Within 30 days of the new gasoline UST system installation:(a) Sample each site supply well and monitoring well using a method approved by the Department; and(b) Test each sample obtained in §F(2)(a) of this regulation in accordance with Regulation .03-3 of this chapter;(3) Annually thereafter sample and test as required in §F(2)(a)-(b) of this regulation; and(4) Test the UST system after any repairs are completed in accordance with Regulation .03-4A(2) of this chapter.Md. Code Regs. 26.10.02.03-2
Regulations .03-2 adopted as an emergency provision effective January 26, 2005 (32:4 Md. R. 404); emergency provision extended at 32:15 Md. R. 1315
Regulations .03-2 adopted effective January 16, 2006 (33:1 Md. R. 37)
Regulation .03-2F amended effective April 19, 2010 (37:8 Md. R. 621)