Section 26.04.06.65 - Innovative Project - Modifications of a Sewage Sludge Utilization Permit
A. The Department may modify a Sewage Sludge Utilization Permit to include a new condition as may be required by a new law or regulation, to clarify permit conditions, or for other good cause.
B. The Department may modify a Sewage Sludge Utilization Permit upon request by the permittee if the following conditions are met:
(1) The permittee submits to the Department four completed copies of the Sewage Sludge Utilization Permit modification application on a form provided by the Department, and all other required information and forms as determined by the Department. The application shall include a description of the proposed modification and an explanation as to why the modification is needed;
(2) The permittee pays the Department a nonrefundable Sewage Sludge Utilization Permit modification fee in accordance with the following schedule:
(a) For a minor modification, $40; and
(b) For a major modification, $130; and
(3) The Department determines that the proposed modification is in compliance with the applicable requirements of this chapter and will not cause an undue risk to the environment or public health, safety, or welfare.
C. The following are minor modifications to a Sewage Sludge Utilization Permit for an innovative project:
(1) Modification to the project's operation plan;
(2) Modification to the project's water quality monitoring plans;
(3) Modification to the project's odor control procedures;
(4) Modification to the days or hours of operation;
(5) The permittee's name change; or
(6) Other modifications as determined by the Department.
D. The following are major modifications to a Sewage Sludge Utilization Permit for an innovative project:
(1) Modification to the source or type of the sewage sludge utilized;
(2) Modification to the utilization method;
(3) Modification to the engineering plans and specifications, if applicable; or
(4) Other modifications as determined by the Department.
E. If the Department considers a modification application complete and acceptable, the Department may modify the Sewage Sludge Utilization Permit.
F. If the Department modifies a Sewage Sludge Utilization Permit, the Department shall send notice of the modification to the local health official and the local soil conservation district in the county in which the Sewage Sludge Permit is issued by the Department.
G. The Department may deny a modification application if the permittee is not in compliance with the applicable requirements of this chapter or any of the terms and conditions of the Sewage Sludge Utilization Permit or for other good cause as determined by the Department.

Md. Code Regs. 26.04.06.65

Regulations .65 adopted effective (41:10 Md. R. 562, eff.5/26/2014