Current through Register Vol. 51, No. 24, December 2, 2024
Section 21.12.02.08 - Compensation for ServicesA. Unacceptable Methods. The following methods of compensation are not acceptable: (1) Cost plus a percentage of cost;(2) Percentage of construction cost.B. The determination of the method of compensation shall be made by the Procurement Agency.C. Prices shall be negotiated in accordance with State Finance and Procurement Article, § 13-214, Annotated Code of Maryland.D. Audit. The Procurement Agency shall arrange for pre-audits and post-audits, as required. All rates used in cost-plus-fixed-fee compensations shall be verified.E. Monitoring. (1) A follow-up monitoring system to fairly evaluate the consultants)' performance shall be initiated by the Procuring Agency. As a minimum, this shall include an evaluation of quality of work, timeliness of completion, effectiveness, and responsiveness to the agency's needs.(2) The Procuring Agency shall maintain a post-evaluation file for each consultant performing work and shall be considered in performing their evaluations.Md. Code Regs. 21.12.02.08
Regulations .08F amended effective April 1, 1986 (13:3 Md. R. 273)
Regulations .08 amended effective January 9, 1989 (15:27 Md. R. 3138)
Regulation .08A amended effective April 8, 1985 (12:7 Md. R. 708); amended effective 45:6 Md. R. 321, eff. 3/26/2018