An invitation for revised bids based on revised specifications or quantities shall be issued as promptly as possible, and shall provide for a prompt response to the revised requirements. If the award is to be made without conducting discussions, the invitation for revised bids shall so state.
Md. Code Regs. 21.05.04.02