Md. Code Regs. 20.50.06.05

Current through Register Vol. 52, No. 1, January 10, 2025
Section 20.50.06.05 - Post-Installation Inspections

Post-installation inspections on new or upgraded service installations which incorporate instrument transformers to determine proper operation and wiring connections shall be made within 60 days after installation by a qualified person who shall be someone other than the original installer.

Md. Code Regs. 20.50.06.05