Md. Code Regs. 14.01.01.02

Current through Register Vol. 51, No. 24, December 2, 2024
Section 14.01.01.02 - Rules of Construction
A. Singular and Plural. In interpreting and applying this subtitle, the singular includes the plural.
B. Computation of Time.
(1) In computing a period of time prescribed by this subtitle or an applicable statute, after a day, act, or event occurs, the following rules apply:
(a) The day of the act, event, or default after which the designated period of time begins to run is not included;
(b) If the period of time allowed is more than 7 days, intermediate Saturdays, Sundays, and legal holidays are counted;
(c) If the period of time allowed is 7 days or less, intermediate Saturdays, Sundays, and legal holidays are not counted; and
(d) The last day of the computed period is included unless it is a Saturday, Sunday, or legal holiday, in which event the period runs until the end of the next day that is a work day.
(2) In computing a period of time prescribed by this subtitle or an applicable statute, before a day, act, or event occurs, the following rules apply:
(a) In determining the latest day for performing an act that is required to be performed a prescribed number of days before a certain day, act, or event, all days preceding that day, including intervening Saturdays, Sundays, and legal holidays, are counted in the number of days so prescribed; and
(b) The latest day is included in the determination unless it is a Saturday, Sunday, or legal holiday, in which event the latest day is the first preceding day that is a work day.

Md. Code Regs. 14.01.01.02

Regulation .02 adopted effective 50:25 Md. R. 1089, eff. 12/25/2023