The fee for depositing dredged material in a facility shall be a reasonable fee, to be determined by, and in the sole discretion of, the MPA, of not less than $2 per cubic yard. If the fee is in the form of an exchange of property, goods, or services, or all of these, it requires the approval of the Maryland Port Commission.
Md. Code Regs. 11.05.06.05