Current through Register Vol. 51, No. 25, December 13, 2024
Section 11.04.17.06 - ProceduresA. To obtain a Heavy Weight Port Corridor permit, the applicant shall submit, directly to the Unit, a completed application on a form and in a manner prescribed by the Unit. The applicant shall allow 5 working days for processing the permit request.B. The Unit may issue a Heavy Weight Port Corridor permit that is valid for 1 year.C. The Unit shall issue the permit for the truck tractor listed in the application.D. The permittee shall read the permit upon receipt and be familiar with all terms and conditions.E. The permittee or user of a Heavy Weight Port Corridor permit shall carry the original (not a copy) of the permit on the overweight vehicle when moving the vehicle on a highway in the State.Md. Code Regs. 11.04.17.06
Regulations .06 adopted effective 47:8 Md. R. 435, eff. 4/20/2020