Environmental Assessment Form (EAF)
This form is to assist the reviewers in determining whether a proposed action could cause significant natural and socioeconomic environmental effects and thus require an environmental effects report.
Department _______________________________ Division _________________________
Other _______________________________________________________________________
Project Title _______________________________________________________________
Predicted Dates: Commencement _______________________________________________
Completion _____________________________ Projected Cost _____________________
Yes | No | CommentsAttached | |
A. Land Use Considerations. | |||
1. Will the action be within the 100-year flood plain? | ___ | ___ | ______ |
2. Will the action require a permit for construction or alteration within the 50 year flood plain? | ___ | ___ | ______ |
3. Will the action require a permit for dredging, filling, draining, or alteration of a wetland? | ___ | ___ | ______ |
4. Will the action require a permit for the construction or operation of facilities for solid waste disposal including dredge and excavation spoil? | ___ | ___ | ______ |
5. Will the action occur on slopes exceeding 15 percent? | ___ | ___ | ______ |
6. Will the action require a grading plan or a sediment control permit? | ___ | ___ | ______ |
7. Will the action require a mining permit for deep or surface mining? | ___ | ___ | ______ |
8. Will the action require a permit for drilling a gas or oil well? | ___ | ___ | ______ |
9. Will the action require a permit for airport construction? | ___ | ___ | ______ |
10. Will the action require a permit for the crossing of the Potomac River by conduits, cables, or other like devices? | ___ | ___ | ______ |
11. Will the action affect the use of a public recreation area, park, forest, wildlife management area, scenic river, or wildland? | ___ | ___ | ______ |
12. Will the action affect the use of any natural or man-made features that are unique to the county, State, or nation? | ___ | ___ | ______ |
13. Will the action affect the use of an archaeological or historical site or structure? | ___ | ___ | ______ |
B. Water Use Considerations. | |||
14. Will the action require a permit for the change of the course, current, or cross section of a stream or other body of water? | ___ | ___ | ______ |
15. Will the action require the construction alteration, or removal of a dam, reservoir, or waterway obstruction? | ___ | ___ | ______ |
16. Will the action change the overland flow of storm water or reduce the absorption capacity of the ground? | ___ | ___ | ______ |
17. Will the action require a permit for the drilling of a water well? | ___ | ___ | ______ |
18. Will the action require a permit for water appropriation? | ___ | ___ | ______ |
19. Will the action require a permit for the construction and operation of facilities treatment or distribution of water? | ___ | ___ | ______ |
20. Will the project require a permit for the construction and operation of facilities for sewage treatment or land disposal of liquid waste derivatives? | ___ | ___ | ______ |
21. Will the action result in any discharge into surface or subsurface water? | ___ | ___ | ______ |
22. If so, will the discharge affect ambient water quality limits or require a discharge permit? | ___ | ___ | ______ |
C. Air Use Considerations. | |||
23. Will the action result in any discharge into the air? | ___ | ___ | ______ |
24. If so, will the discharge affect ambient air quality limits or produce a disagreeable odor? | ___ | ___ | ______ |
25. Will the action generate additional noise which differs in character or level from present conditions? | ___ | ___ | ______ |
26. Will the action preclude future use of related air space? | ___ | ___ | ______ |
27. Will the action generate any radiological, electrical, magnetic, or light influences? | ___ | ___ | ______ |
D. Plants and Animals. | |||
28. Will the action cause the disturbance, reduction, or loss of any rare, unique, or valuable plant or animal? | ___ | ___ | ______ |
29. Will the action result in the significant reduction or loss of any fish or wildlife habitats? | ___ | ___ | ______ |
30. Will the action require a permit for the use of pesticides, herbicides, or other biological, chemical, or radiological control agents? | ___ | ___ | ______ |
E. Socio-Economic. | |||
31. Will the action result in a preemption of division of properties or impair their economic use? | ___ | ___ | ______ |
32. Will the action cause relocation of activities or structures, or result in a change in the population density or distribution? | ___ | ___ | ______ |
33. Will the action alter land values? | ___ | ___ | ______ |
34. Will the action affect traffic flow and volume? | ___ | ___ | ______ |
35. Will the action affect the production, extraction, harvest, or potential use of a scarce or economically important resource? | ___ | ___ | ______ |
36. Will the action require a license to construct a sawmill or other plant for manufacture of forest products? | ___ | ___ | ______ |
37. Is the action in accord with federal, state, regional, and local comprehensive or functional plans-including zoning? | ___ | ___ | ______ |
38. Will the action affect the employment opportunities for persons in the area? | ___ | ___ | ______ |
39. Will the action affect the ability of the area to attract new sources of tax revenue? | ___ | ___ | ______ |
40. Will the action discourage present sources of tax revenue from remaining in the area, or affirmatively encourage them to relocate elsewhere? | ___ | ___ | ______ |
41. Will the action affect the ability of the area to attract tourism? | ___ | ___ | ______ |
F. Other Considerations. | |||
42. Could the action endanger the public health, safety, or welfare? | ___ | ___ | ______ |
43. Could the action be eliminated without deleterious effects to the public health, safety, welfare, or the natural environment? | ___ | ___ | ______ |
44. Will the action be of Statewide significance? | ___ | ___ | ______ |
45. Are there any other plans or actions (federal, State, county, or private) that, in conjunction with the subject action, could result in a cumulative or synergistic impact on the public health, safety, welfare, or environment? | ___ | ___ | ______ |
46. Will the action require additional power generation or transmission capacity? | ___ | ___ | ______ |
G. Conclusion. | |||
47. This Agency will develop a complete Environmental Effects Report on the proposed action. | ___ | ___ | ______ |
Letterhead of issuing agency (or: "This statement has been issued by (name of agency).")
___________ Other legislative action, i.e., requests for proposed legislative acts and/or expansion of existing acts or agency authority, or passage of laws which will require legislative appropriation.
Comments | None | Adverse | Beneficial |
A. Land ______________________________________ | |||
____________________________________________ | _____ | ______ | _______ |
B. Water _____________________________________ | |||
____________________________________________ | _____ | ______ | _______ |
C. Air ________________________________________ | |||
____________________________________________ | _____ | ______ | _______ |
D. Plants _____________________________________ | |||
____________________________________________ | _____ | ______ | _______ |
E. Animals ___________________________________ | |||
____________________________________________ | _____ | ______ | _______ |
F. Socio-economic _____________________________ | |||
____________________________________________ | _____ | ______ | _______ |
G. Other _____________________________________ | |||
____________________________________________ | _____ | ______ | _______ |
Md. Code Regs. 11.01.08.08