Current through Register Vol. 51, No. 22, November 1, 2024
Section 09.12.81.04 - Final Acceptance InspectionA. A final acceptance inspection by the Commissioner is required before the Commissioner may issue a certificate of registration and inspection on all new or modified elevator units.B. A contractor shall request a final acceptance inspection at least 30 days before the date the contractor requests for the final acceptance inspection to be conducted.C. A contractor may cancel a scheduled inspection under this regulation by written notice to the Commissioner at least 24 hours before the scheduled inspection.Md. Code Regs. 09.12.81.04
Regulations .04 adopted as an emergency provision effective July 5, 2001 (28:15 Md. R. 1394); adopted permanently effective October 1, 2001 (28:19 Md. R. 1684)
Regulation .04A amended as an emergency provision effective October 15, 2007 (34:23 Md. R. 2019); amended permanently effective February 25, 2008 (35:4 Md. R. 514)