Current through Register Vol. 51, No. 22, November 1, 2024
Section 09.12.01.02 - Access and EgressA. Clearance. (1) Except for a water heater or a modular boiler system, a new or replacement boiler installed in a new or existing building shall be installed consistent with: (a) Or exceeding, the manufacturer's recommendations for clearance; and(b) The space requirements of §A(6) of this regulation.(2) In the event manufacturer recommendations for clearance are not provided, a new or replacement boiler installed in a new or existing building, shall: (a) Have at least 3 feet between: (i) The top of the boiler and the ceiling, and(ii) Each side of the boiler and the adjacent wall or other structure; and(b) Comply with the conditions of §A(6) of this regulation.(3) The distance between or around a new or replacement boiler in a modular boiler system installed in a new or existing building shall be in accordance with the manufacturer's recommendations while ensuring: (a) There are 3 feet between each side of the perimeter of the boiler system and the adjacent wall or structure; and(b) The conditions in §A(6) of this regulation are met.(4) The distance between or around a water heater installed in a new or existing building shall be in accordance with the manufacturer's recommendations while ensuring the conditions of §A(6) of this regulation are met.(5) A boiler or pressure vessel having a manhole shall have 5 feet clearance from the manhole opening to any wall, ceiling, or piping that prevents entrance through the manhole.(6) A boiler or pressure vessel shall be located to provide adequate space for: (a) Proper operation of the boiler or pressure vessel and its appurtenances;(b) Inspection of all surfaces, tubes, water-walls, economizers, piping, valves, and other equipment; and(c) Required maintenance and the repair and replacement of tubes.B. Ladders and Runways. (1) When necessary to afford safe access, a steel runway or platform of standard construction shall be installed across the tops of adjacent boilers or pressure vessels, or at another convenient level.(2) When a valve or appurtenance requiring frequent manipulation cannot be reached or operated from the floor, a platform or other safe means of operation shall be provided.(3) A platform or runway shall:(a) Be at least 24 inches wide;(b) Have standard handrails and toe boards; and(c) Provide at least 7 feet, 6 inches overhead clearance.(4) A runway shall: (a) Have at least two means of exit, located remotely from each other; and(b) Be connected to floor level by:(i) A permanent stairway, orC. Each elevation in a boiler room shall have at least two exits, located remotely from each other, if the room: (1) Exceeds 500 square feet floor area; and(2) Contains one or more boilers having a fuel-burning capacity of 1,000,000 Btu per hour, or equivalent electrical heat input.Md. Code Regs. 09.12.01.02
Regulation .02CC amended and .02DD repealed effective June 1, 1982 (9:8 Md. R. 821)
Regulation .02PP amended effective November 4, 1985 (12:22 Md. R. 2103)
Regulations .02 adopted effective June 1, 1989 (16:10 Md. R. 1106)
Regulation .02A amended effective October 7, 1996 (23:20 Md. R. 1422); July 10, 2000 (27:13 Md. R. 1211); February 19, 2001 (28:3 Md. R. 205)