Within sixty (60) days of the date that an application for a permit, variance, or special use variance is properly completed, the Commission shall render a written decision on such application (1) denying the application, (2) granting the application with such conditions as the Commission deems necessary, or (3) ordering a public hearing.
Should the Commission be evenly divided as to whether to approve or deny the application, such a vote shall have the effect of denying the application.
94- 412 C.M.R. ch. 101, § 4