94- 412 C.M.R. ch. 101, § 1

Current through 2024-51, December 18, 2024
Section 412-101-1 - Scope

Section 1 though 13 of these regulations shall apply to applications filed with the Saco River Corridor Commission (hereinafter called the Commission) for permits required under Section 959, variances from performance standards under Section 963, and special use variances under Section 963-A of the Saco River Corridor Act (hereinafter referred to as the "Act"), Title 38 M.R.S.A. Section951 et seq. Regulations regarding Certificates of Compliance as authorized under Section 954-C. of the Act are presented in Section 7 through 13 of these regulations.

94- 412 C.M.R. ch. 101, § 1